Sâmbătă, 26 Aprilie 2025
RO EN

CONSULTANCY: Planning, designing and constructing metallic structures

The elevation of structural steelwork consists of the assembly of steel components into a frame on site. The processes involve lifting and placing components into position, then connecting them together. Generally this is achieved through bolting, but sometimes the site welding is used. The assembled frame needs to be aligned before bolting up is completed, and the structure have to be handed over to the principal contractor. To achieve the client's aspirations on cost and quality, planning the construction should start at the very beginning of the design process. Such planning should consider the construction sequence, the design factors that affect "buildability" and site practice in terms of typical elevation plant. Choosing simply-assembled connections will affect the ability to use site welding. One of the key parameters when planning for elevation is the piece-count. The number of pieces elevated is dependent on the choice of crane, and its availability for steel elevation rather than other construction activity. Cranes vary in their rapidity of movement (hook travel, slewing and jibbing out), and their overall productivity can also be influenced by a wise choice of location within the site footprint. Rates of elevation are also influenced by whether special rigging methods and devices can be used for slinging and release of loads. As for lining, leveling and plumbing, these activities consists of an interaction between the site engineer using the survey instrument and the elevation team doing the final bolt tightening and shimming. By the progressive use of wedges, jacks, pull-lifts and proprietary pulling devices the elevation team persuades the frame to move to a position acceptable to the checking engineer and then bolts it up firmly. Tolerances on frame and member geometry are specified in order to ensure that the "as built" frame geometry complies with the designer’s assumptions. The final objective of the process is to handover the frame to following trades in an acceptable condition.

Din aceeasi categorie

31 Mar 10:04 | SUSTAINABLE development through new solutions and traditional methods
29 Mar 09:15 | ALUMINUM systems - a market with a huge potential
28 Mar 09:26 | WOOD and composites for the building materials of the future
24 Mar 09:58 | LIMITED opportunities for companies in the fenestration industry
23 Mar 10:52 | IMPLEMENTATION of ecodesign directive on HVAC systems
22 Mar 09:07 | Efficient technologies revolutionizing the field of HVAC
16 Mar 10:45 | Increases of 5.8% estimated for PVC windows producers
21 Noi 09:42 | PWC: Six predictions in real estate for 2020 and beyond - in brief
18 Noi 15:49 | ANALYSIS: Resumption at optimal parameters of buildings developments
18 Noi 15:38 | STRABAG remains the leader of the Romanian construction sector
Agenda Investitiilor
ABONARE REVISTA (click aici):  PROIECTE | INVESTITII | REVISTE | INDEX COMPANII
DATE DE CONTACT: Agenda Constructiilor & Fereastra - Tel: 021-336.04.16
AGENDA INVESTITIILOR
EURO-CONSTRUCTII
EURO-FEREASTRA
FEREASTRA